Beautiful homes ready to go!Lovely building sites for your dream home!view and print, material for inspiration!for more information on Monarch Homes!we can help with your projectit's nice to be noticed!read the latesthome building step by steplearn the lingo!every season has it's chores!reach us quickly!

FOUNDATION STAGE
The foundation is the concrete structure that supports your entire house. The time required to build a foundation varies depending on your city's inspection codes and your geographic location. In Denver, for example, frost zones must be considered while, in California they have to think about earthquakes. Soil conditions, integrity of the ground, government requirements, wind, and the size of the home need to also be taken into consideration. Ultimately, a structural engineer determines the best foundation system for your home. Then the superintendent sets forms, pours the foundation and installs rough plumbing.

FRAMING STAGE
The frame is the skeleton of your home. Most homes have wood frames but sometimes cement block or other materials are used. Windows and fireplaces are placed in the frame and, in some cases, wall paneling. This phase takes between 4 - 8 weeks.

ROUGH MECHANICALS
If the frame is the skeleton, then the rough mechanicals are the internal organs of your home. During this phase, air-conditioning, heating, ventilation, plumbing, and electrical wiring are introduced to the structure. If you've opted for any special security systems, central vacuum, or pre-wiring for your stereo and entertainment centers, installation takes place at this point. Typically, you'll be invited down to the site for a "frame walk" or orientation to verify that all the options you selected are in place.

FINISHES
This is the midway point of the building process. The finish is the skin of your home, including drywall, stucco, roofing, siding, concrete walls, the driveway, and all major interior and exterior surfaces. All of these finishing touches really help your house start to look like home. Countertops and cabinets are installed, the house is painted and stained. Tile is laid in the kitchen and bath, and any additional plumbing and electrical projects come to completion.

TRIM OUT STAGE
During this two-week phase, you will begin to recognize the home you designed and imagine the future you'll create. The team installs faucets and sinks, light switches, towel bars, doorknobs and all of the small hardware you'll be using on a daily basis.

FINALS
Workers wait until this final week to install the flooring in the interest of protecting your carpets and hardwood from boots, nails and dust. Any minor adjustments take place now, like window screens, drywall and paint touchups. The house is given a thorough cleaning and is ready for the final orientation.

FINAL ORIENTATION
After hard work, patience, and a lot of teamwork, it's time to do the final walk through. You gather with your builder and inspect the premises.

Folsom Office: 706 Natoma Street, Folsom, CA 95630 csl # 809688
(916) 355-8181 | Fax: (916) 355-0191
email: info@monarchhomes.net

Palm Desert Offices: 73-290 El Paseo, Suite #4, Palm Desert, CA 92260 csl # 457228
(760) 568-3905 | Fax: (760) 568-3946
email: jeff@monarchhomes.net


LEGAL DISCLAIMER: Square footages are approximate. Illustrations are artist's depictions only and may differ from completed improvements. In a continuing effort to make product improvements, Monarch Homes, Inc. reserves the right to change elevation specification, materials, design and prices without notice or obligation.
CSL#809688

COPYRIGHT 2004, 2005, 2006, 2007 MONARCH HOMES, INC. site design Glenda Bell